Mt. Blue Learning Campus, Farmington, ME

________________________________________________________________________________

A 225,000 SF High School and Technology Center

 

                                                                                               

Project Cost: $60,000,000.00

Project Personnel: Stephen P. Doel

Year Complete: Phase 1 - 2011

Phase 2 - 2012

 

Bennett Engineering, Inc. designed heating, ventilating, air conditioning and sanitary plumbing for this project, mechanical/electrical design conforms to Maine State High Performance Building Standards, Benchmark Maine, and LEED Certification. Design included a 3.5 MMBTU wood chip hot water boiler system with indirect-fired water heaters, fee-standing chimney, wood chip bin, conveyors, automatic ash removal, electrostatic precipitator. 

 