WG Mallet Elementary School, Farmington, ME

__________________________________________________________________________________________

A 60,000 SF K-3 Elementary School      

 

Project Cost: $15,000,000.00

Project Personnel: Stephen P. Doel

Year Complete: 2011

 

Bennett Engineering, Inc. designed heating, ventilating, air conditioning and sanitary plumbing for this project, mechanical/electrical design conforms to Maine State High Performance Building Standards, Benchmark Maine, and LEED Certification. Design included a 2.8 MMBTU wood pellet hot water boiler system with indirect-fired water heaters, fee-standing chimney, thermal buffer tank, wood pellet silo, flexible auger, automatic ash removal, with a solar domestic hot water preheat system.

 

Our Projects

Ridge View Community School

 

WG Mallet Elementary School

 

Mt. Blue Learning Campus